Tamdown will be carrying out tarmacing works on behalf of the developer , Vistry formerly Countryside P’Ships, on Augustus Way + Edgewater.
1 – Monday 18th March – planing off old road surface. This will be noisy and cause disruption from 08:00-17:00 area affected in highlighted Pink.
2- Tuesday 19th March – new tarmac installed including the footpath at BM4 from 08:00-17:00.
The road will be open in the evening . Residents are advised to use the numerous visitor bays highlighted in green.
A letter drop will be made by Vistry to residents in the affected areas.
Access will have to be made over the secondary access bridge at the marina.
Source: www.cmtrust.co.uk
Add comment